Scheduled Update: SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)

OxBlue - Picture a Better Jobsite
SR 99 access pit #2
Image Time: January 6th, 2016, 11:56 am
Temp: 47° F Pressure: 29.63 In
Conditions: Overcast Wind: 3 Mph / ENE
Heat Index: N/A Dewpoint: 41° F
Visibility: 10.0 Mi Humidity: 81 %
Jobsite images and information included in this email are the property of OxBlue’s client and may
not be used, reprinted or reproduced without the express written permission of OxBlue’s client.
© 2016 OxBlue Corporation. All rights reserved. http://www.OxBlue.com
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s