Scheduled Update: SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)

OxBlue - Picture a Better Jobsite
SR 99 access pit #2
Image Time: September 16th, 2015, 11:58 am

Weather:
Temp: 64° F Pressure: 29.88 In
Conditions: Mostly Cloudy Wind: 1 Mph / SSW
Heat Index: N/A Dewpoint: 48° F
Visibility: 10.0 Mi Humidity: 57 %
Cancel scheduled delivery of this photo.
Jobsite images and information included in this email are the property of OxBlue’s client and may
not be used, reprinted or reproduced without the express written permission of OxBlue’s client.
© 2015 OxBlue Corporation. All rights reserved. http://www.OxBlue.com

open.php?u=30483621&id=7d2f2faf13934424a712bdaf74871a8e

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s