Scheduled Update: SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)

OxBlue Email Header
SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)
Image Time: April 22nd, 2015, 11:48 am
Temp: 55 F Pressure: 30.20 In
Conditions: Mostly Cloudy Wind: 1 Mph / NNE
Heat Index: N/A Dewpoint: 40 F
Visibility: 10.0 Mi Humidity: 58 %
Jobsite images and information included in this email are the property of OxBlue’s client and may
not be used, reprinted or reproduced without the express written permission of OxBlue’s client.
© 2015 OxBlue Corporation. All rights reserved. http://www.OxBlue.com
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s