Scheduled Update: SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)

SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)
Image Time: January 28th, 2015, 11:56 am
Temp: 51° F Pressure: 30.39 in
Conditions: Mostly Cloudy Wind: 0.0 mph / North
Heat Index: N/A Dewpoint: 43° F
Visibility: 10.00 mi Humidity: 74%
Jobsite images and information included in this email are the property
of OxBlue’s client and may not be used, reprinted or reproduced without
the express written permission of OxBlue’s client.
© 2015 OxBlue Corporation. All rights reserved. http://www.OxBlue.com
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s