Scheduled Update: SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)

OxBlue Email Header
SR 99 access pit #2 (Alaskan Way Viaduct Replacement Program #2)
Image Time: November 26th, 2014, 11:58 am
Weather:
Temp: 61° F Pressure: 30.12 in
Conditions: Overcast Wind: 9.2 mph / South
Heat Index: N/A Dewpoint: 52° F
Visibility: 10.00 mi Humidity: 72%
Jobsite images and information included in this email are the property of OxBlue’s client and may
not be used, reprinted or reproduced without the express written permission of OxBlue’s client.
© 2014 OxBlue Corporation. All rights reserved. http://www.OxBlue.com
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s